pagelmslogobanner

TRIANGULAR GIN POLES

TRIANGLE STEEL GIN POLES:

TRIANGLE ALUMINUM GIN POLES:

LMS PT12A. IN PRODUCTION

LMS PT 15A  IN PRODUCTION

LMS PT 18A IN PRODUCTION

  • AWS CERTIFIED
  • U.S. AWS CERTIFIED WELDER ASSEMBLED
  • U.S. CERTIFIED GIN POLE AWS WELDER ASSEMBLED
  • CERTIFIED AWS INDEPENDENT U.S. CONTRACTOR INSPECTED
  • MEETING AWS D1.1:2015 STRUCTURAL WELDING CODE-STEEL
  • LOAD CHARTS ARE POLE SPECIFIC WITH MATCHING SERIAL NUMBERS
  • 5.0    ANALYSIS AND DESIGN OF GIN POLES
  • 6.0   GIN POLE CONSTRUCTION
  • ROOSTER HEAD
  • METALIZED SURFACE
  • OPTIONAL SST ROLLER END
  • GIN POLE STORAGE RACKS

OSHA required Forms supplied with all LMS gin poles we manufacture.

  • Annual Pole Certification signed and numbered
  • Annual Pole Inspection Report signed and numbered
  • VT Visual Welding Inspection Report, done at time of manufacture
  • Mill Report on steel specification ASTM A500, Grade B/C
  • Charpy report on steel temperature test to –40 degrees
  • PE Stamped Pole specific Load Chart

Charts are pole specific with serial numbers.

Serial numbers on Pulleys must match the serial number of the Gin Pole. This will be required to complete the annual Gin Pole Inspection. All gin poles using a load line other than steel shall be classified as class A Gin Poles for all load line diameters.

We do not supply any accessory hardware or assembly bolts. Use 1×2.5 A325 Structure bolts, washers, and nuts only. Remember to inspect before re-using.

Complete records of pole inspections and record of Magnetic particle inspections shall be performed on 10% of the welded connections every ten years. Annual inspection reports shall be maintained for a minimum of two years. All gin pole operations must comply with the latest revision of ANSI/TIA-322 and the OSHA CPL 2-1.36

Certified Green Gin Poles are manufactured 100% from USA recycled steel.

WARNING:  Our Triangular Gin Poles are designed to specifications, and the gross load  “when lifting personnel shall not exceed 50% of the charted safe lifted loads. No other construction loads shall be lifted with personnel.”

http://ginpoleinspection