LMS 50 RT Crack-Up Mastr, which goes up to 178 feet and is mounted on trailers, skids, or auto-leveling platforms. Engineered for high wind and heavy loading. Safety built-in with no exposed pulleys or cabling winds, safety climbs, and lockouts for additional safety on all lattice tower designs. Platform safety includes LineX sprayed decks, locking outrigger, and jacks. Grounding lugs and ground rods built-in. Never a failure of a tower engineer plan or trailer deployed worldwide. You can also find Landa Mobile Systems towers HEREYou can also find other LMS news HERE
50′ CRANK-UP MAST, REMOVABLE TONGUE FOR SHIPPING
50 ft crank up-mast on a trailer with removable tonguealso
150 Lb / 68 Kg Head-load exclusive Delrin guide stabilization within sectionsalso
Wind rated to 85 MPH with two flat-panel antennas guyed to outriggersalso
Wind rating substantially increased when guyed to ground per engineeralso
52′ steel crank up telescopic mastalsoalso
Optional 10 ft / 3 m or 12 ft / 3.65 m extensions also
4 ea sections also
4 ea coax rings also
39″ T-bar top mount for antenna placement, optional wi-fi cellular mounts also
Heavy-duty mast and base also
All tubing 1 /4 “thick wall also
High wind all-terrain off-road applications also
Nested height 48″ with rear-mounted nesting pedestal also
Engineered and designed to meet rigor demands also
2 ea 4000 Lb lift, 12-volt electric winches w /remote also
2 ea winch covers, waterproof and dustproof
7,000 Lb / 3175 Kg GVWR also
LMS Trailer
LMS Patent-pending trailer design also
5 ft removable tongue also
6′ X 16′ Custom flatbed design also
Diamond plate 11 gauge decking also
Waterfall deck edges giving 400% more stability also
6″ Channel heavy-duty off-road construction also
3″ Channel cross-members on 16″centers also
4 ea weld on D-Rings on each corner of the trailer also